School students learn about nature conservation
4 July 2024
2 November 2023
Southeastern are carrying out works to investigate the feasibility of extending the platforms at Westenhanger Station to meet current and future demand.
As part of these investigations, Southeastern’s engineering contractor (Invvu Construction Consultants Ltd) will undertake several small-scale surveys between October 2023 and March 2024.
These surveys will range from site meetings and measurements, to the drilling of boreholes and the excavation of small inspection pits.
Where possible, surveys will take place between 8am – 5pm on weekdays. However, some will require work outside of this time.
If you have any questions, please contact matthew.morris@southeasternrailway.co.uk.
4 July 2024
19 June 2024
7 May 2024
Sign up for the latest news on events and progress at Otterpool Park.